Received an HOA violation letter for faded paint, mildew, or stucco cracks in Wesley Chapel, Lutz, or Tampa? How to get ARC approval and repaint fast.
When a Florida homeowner receives a deed-restriction violation notice for faded exterior paint, chalking stucco, or fascia mildew—typically carrying a 30-to-60-day cure window before $100/day statutory fining hearings under Florida Statute § 720.305—the fastest path to compliance is submitting an Architectural Review Committee (ARC) package with exact manufacturer color codes, contractor COI/licensing documentation, and a scheduled pressure-wash and 2-coat elastomeric/acrylic repaint date.
Master-planned HOA communities in Wesley Chapel, Lutz, Riverview, Westchase, and Winter Haven conduct quarterly drive-by inspections looking for UV-chalked body colors, rusted corner beads, and algae-stained soffits.
Even if you are repainting your home the exact same original color, most Florida HOAs still require an Architectural Review Committee (ARC/ARB) application prior to starting exterior painting. Our team prepares the exact Body, Trim, and Accent swatch sheet and Certificate of Insurance (COI) required by your community manager.
Before rolling a single drop of paint, our repair and maintenance crew seals settlement cracks around windows, replaces rotted wood trim or fascia, and pressure-washes driveways and lanais so your home passes its HOA compliance re-inspection on the first visit.
| Timeline Step | Action Required | How Teem Multiservices Assists |
|---|---|---|
| Days 1 – 3 | On-Site Inspection, Color Matching & ARC Form Preparation | We identify approved HOA palette codes (Sherwin-Williams / Benjamin Moore) and supply our COI & license packet |
| Days 4 – 14 | ARC / ARB Committee Review + Compliance Extension Notice | Written contractor scheduling letter sent to the CAM to pause HOA fine escalation while ARC reviews |
| Days 15 – 18 | Fungicidal Pressure Wash, Stucco Crack Repair & Trenching | 3,000 PSI biocide wash, perimeter soil trenching, window caulking, and chalk-binding masonry sealer |
| Days 18 – 21 | 2-Coat 100% Acrylic / Elastomeric Application & Final Sign-Off | Date-stamped completion photos emailed directly to your HOA property manager to close the violation |
Yes. We work with all major Tampa Bay, Pasco, Hillsborough, Pinellas, Polk, and Orange County HOA color palettes and provide exact brand/code documentation for your ARC submittal.
In nearly all Florida HOAs, providing the Community Association Manager (CAM) with a signed contractor proposal, ARC application, and scheduled start date stops fine escalation immediately.